Skip to content
airport forecourt

Low Moor Railway Platform Drainage Solution

A railway station has been present at Low Moor since 1848. The station underwent £10.8M of renovations, including accessible platforms, waiting shelters and a new car park with 128 spaces.

The new station brings extra connectivity between Bradford, the rest of the country such as London, Leeds and other regions on the Calder Valley line.

Product Load Class
150 m of RECYFIX PRO C 250

Location

Bradford, West Yorkshire

Drainage requirements: stability, longevity and durability

Train pulls into station

Surface drainage was required for the platforms for efficient rainwater management and the prevention of flooding during heavy rainfall. With over 50,000 passengers (per year) expected to use Low Moor Railway Station, the specified drainage system needed to be durable enough to withstand moderate foot traffic.

As some of the channels would be installed nearer the outer edge of the platform, the system required non-corrosive cover, as foot traffic would be minimal within these areas. Non-treated ductile iron covers would oxidise, leaving a non-aesthetic appeal.

RECYFIX PRO: a vital link for railway platform drainage

Drainage system on the low-moor railway platform

RECYFIX PRO provided the perfect combination of aesthetics, durability and performance. The channel and cover are manufactured from corrosion-resistant modified polypropylene composite. The award-winning FIBRETEC cover has a heelsafe slot width, which is essential in public areas.

The combined benefits of RECYFIX PRO made installation a quick and simple task for the contractor, with the reassurance of long-term performance for the client.

RECYFIX PRO

The choice of performance and aesthetics with RECYFIX PRO

Product visualisation of drainage channel RECYFIX PRO
  • Pre-assembled, lightweight and compact channel units for speed of installation on-site

  • Channel body in modified polypropylene (PP) composite for high impact/corrosion resistance

  • Composite edge-frame formed as an integral part of the channel body structure for enhanced rigidity and aesthetics

  • Highly durable non-corrosive composite cover, completely resistant to salts, UV radiation

  • Covers mechanically fixed to edge-frame housing (2 bars and bolts per metre) for security

Learn more about RECYFIX PRO

Questions?

Our experienced planning team will be happy to help you.

Get in touch
Questions?