Skip to content
Picture from the terrace of the H2B Hotel

Comprehensive rainwater management at the One Central H2B Hotel

The 25-hours Hotel One Central marks the introduction of the 25h brand in the Arab world. Overlooking the Museum of the Future, the hotel offers 434 rooms and suites, flexible co-working areas and five international restaurants and bars. The concept combines traditional Bedouin culture with modern lifestyle, creating a special place for travellers and business people. HAURATON supplied tailor-made rainwater management for the One Central H2B Hotel in Dubai. A combination of FASERFIX and RECYFIX systems and custom-made slotted covers enabled the high architectural and functional requirements to be met.

Product Load Class
572 m of FASERFIX STANDARD C 250
679 m of RECYFIX PRO D 400

Location

Dubai, United Arab Emirates

Challenge: Technical and architectural specifications

The planners at Hopkins Architects and WSP required a drainage system with a construction height of only 25 mm and stainless steel gratings that would blend harmoniously into the sophisticated architecture. Individual geometries were also necessary for special areas such as the Monkey Bar roof terrace and the spa area.

HAURATON scores with flexibility and project expertise

HAURATON was able to prevail with a combined solution consisting of FASERFIX and RECYFIX systems. The products were supplemented with customised stainless steel slotted covers, which were manufactured in various heights and radial shapes to perfectly match the architectural profiles.

A decisive advantage: HAURATON was able to point to numerous successful references in Dubai – including from earlier construction phases of the project. This combination of technical excellence, flexibility and proven project experience led to the decision in favour of HAURATON.

Why did the client choose HAURATON?

In addition to providing a technically suitable system solution, HAURATON impressed above all with its ability to precisely implement complex architectural specifications. Close coordination with the planners made it possible to adapt custom-made products – such as radial slotted covers and customised neck heights – precisely to the lines of the façades, terraces and lounge areas.

In addition, HAURATON offered consistently reliable project support, from technical advice to detailed implementation planning. The locally based teams in the UAE ensured short coordination channels and a quick response to project-related changes. This meant that the client not only received a high-performance drainage system, but also a partner who reliably translated complex design and functionality requirements into reality.

FASERFIX STANDARD

Reliable concrete channels for high design standards in Dubai

Product presentation FASERFIX STANDARD

FASERFIX STANDARD channels are ideal for draining pavements, driveways and parking areas. With a load class of up to C 250, they offer reliable stability for car traffic and pedestrian zones. Frost and de-icing salt resistant and equipped with a wide range of cover options, FASERFIX STANDARD meets the requirements for functionality and design.

  • Available with and without sloping depth channel for greater flexibility

  • High stability thanks to the locking of the gratings by means of locking mechanism

     

  • Sump unit with channel connection option, with removable silt bucket

  • Tongue and groove joints for precise installation

To the product overview

RECYFIX PRO

Stylish drainage for demanding areas

Product presentation RECYFIX PRO.

RECYFIX PRO channels impress with their contemporary, clearly structured design and high design flexibility. Thanks to numerous cover options, they can be harmoniously integrated into sophisticated public and commercial areas. The lightweight yet extremely robust channels achieve a load class of up to C 250 and are permanently resistant to environmental influences and corrosion. They therefore offer a reliable and aesthetically attractive solution for a wide range of applications.

  • Stable and virtually unbreakable RECYFIX material

  • Easy processing on site: cutting and drilling – possible with simple tools

  • Wide selection of visually appealing designer gratings, e.g. hydraulically optimised FIBRETEC slotted grating

  • Withstands high temperature differences from –50 °C to +80 °C and above

To the product overview

Questions?

Our experienced planning team will be happy to help you.

Get in touch
Questions?