The channels were laid in three runs across the site. They were positioned precisely to drain the entire area evenly while providing a large water reservoir.
The construction company carrying out the work was initially sceptical about the new system. However, intensive consultation and instruction from HAURATON ensured that installation was smooth and efficient. The final feedback was overwhelmingly positive.